CI / Build and test (pull_request) Successful in 8m15s
CI / Windows tests and installer (pull_request) Skipped
CI / YAML check (pull_request) Successful in 10s
CI / PostgreSQL 16 integration (pull_request) Successful in 8m46s
CI / PostgreSQL 17 integration (pull_request) Successful in 9m51s
CI / Docker image (pull_request) Successful in 1m45s
The 119 new phase 5b strings are translated into the 36 machine-translated languages. The changelog separates what shipped in 0.1.0-rc.9 (ports and baselines) from the unreleased phase 5b work, and the index settings decision names the rare cases where a newer project.json is kept as version 1. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Owner change requests
One file per request from the product owner, named <date>-<slug>.md. Each file keeps:
- the owner's text, verbatim;
- the working interpretation, numbered (R1, R2, …);
- the questions asked and the owner's answers;
- the delivery plan, phase by phase, with each phase's state, commit, BRIEF/DESIGN sections amended and DECISIONS rows.
A request amends the BRIEF: the amended paragraphs say so, and BRIEF §24 lists every amendment with the request that
made it. DECISIONS rows written for a request cite it (R4, owner review 1). Read the request file first to rebuild
why a part of Chronos is the way it is.