Phase 4b was built on phase 4a before its review fixes. Integrated on the reviewed 4a, the
conversion now follows the same rules as filing and the other writers.
- Names: a converted file is named as filing names a photo of its sequence (FrameNaming: the
archive's file template, the frame's context in the sequence with its camera, lens, number
and title, {name} the card's, {ext} the target's, a long name keeping its extension).
Replace through ConvertOptions.FileName; New sequence through the ingest itself
(StagedFrame.NamedAs), which numbers and names the copies in the new sequence. Names stay
unique against every file present, those leaving included, so a Replace never moves onto a
file; a test pins a stray file that keeps its bytes.
- Leases: stage A starts from the sidecar settled under the sequence's lease where the index
has it then (SequenceWriter.ReadLocked), and FrameTrash.ReplaceAsync reads the row again
under the lease, so a folder a Reorganize moved meanwhile is followed, never made again.
A Reorganize the archive waits for keeps the conversion off its sequences (pinned).
- Journals: the replace journal is settled with the others. MassRenamer steps, restores into
a sequence and sequence deletions wait for an unsettled replacement as they wait for a
restore, and so do photo deletions, whose frames version the recovery reads
(FrameTrash.EnsureReplaced); a scan settles it and reconciles nothing meanwhile; a restore
settles its sequence's replace journal first, at the folder the index has under the lease.
- The convert job tells each sequence converted or made as it completes, as a Reorganize
tells each step, so an editor open on it reads it again while the rest of the job runs.
- Desktop: JobKind.Convert gets its row in the settings' job priority list. A click on Apply
that commits the quality no longer starts the same dry run again under the click (as 4a
fixed for Reorganize).
- Panel: a dry run answered during the confirmation with the same plan no longer drops the
confirmed Apply; a different plan is shown with Admin.Convert.PlanChanged (en, it).
- Tests: TrashDialogTests.EmptyQueuesTheJobOfTheConfirmedPlanOnly waits for the command to
end before running it again (a running AsyncRelayCommand ignored the second Execute).
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
(cherry picked from commit 2e0d1d6dcc10575734970bb9c77749f00777c859)