CI / Build and test (push) Successful in 7m0s
CI / Windows tests and installer (push) Skipped
CI / YAML check (push) Successful in 6s
Release / Build, test and publish (push) Successful in 13m28s
CI / PostgreSQL 16 integration (push) Successful in 5m52s
CI / PostgreSQL 17 integration (push) Successful in 4m50s
CI / Docker image (push) Successful in 1m4s
Release / Server image (push) Successful in 1m35s
- Jobs > Scheduled on the desktop and the admin panel. Every timer that queued work is now a visible system schedule: archive scan, upload clean-up, index backup, job-history and audit clean-ups, desktop housekeeping. New actions: verify, thumbnails, proxies, analysis, maintenance, backup, clean-ups, reports. - The scheduler: migration 0007, in-house recurrence, compare-and-set claim, catch-up, scan at start. - Log settings: levels, retention, size parts, total limit, daily or hourly rotation, audit retention, diagnostics share; the server writes Debug/Trace to its files again; logging never fails a job. Upgrade: CHRONOS_LOG_LEVEL set in an existing container locks both levels; migration 0007 is one-way. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> Co-authored-by: Alberto Balbo <alberto.balbo.96@gmail.com>