7 Commits
Author SHA1 Message Date
Alby96 20d64af4a4 feat: single setup, mass-pass progress, per-server homes, Desktop shares its library (owner review 5, v1.1.0) (#68)
CI / Build and test (push) Successful in 11m36s
CI / Windows tests and installer (push) Skipped
CI / YAML check (push) Successful in 12s
Release / Build, test and publish (push) Successful in 14m56s
CI / PostgreSQL 16 integration (push) Successful in 10m11s
CI / PostgreSQL 17 integration (push) Successful in 10m15s
CI / Docker image (push) Successful in 45s
Release / Server image (push) Successful in 4m55s
Co-authored-by: Alberto Balbo <alberto.balbo.96@gmail.com>
2026-11-15 18:11:43 +01:00
Alby96andClaude Opus 5.5 728ffa35cb feat: export panel and Render menu, playback options, videos library (owner review 1 phase 5) (#27)
CI / Build and test (push) Successful in 9m41s
CI / Windows tests and installer (push) Skipped
CI / YAML check (push) Successful in 9s
Release / Build, test and publish (push) Successful in 14m49s
CI / PostgreSQL 16 integration (push) Successful in 8m51s
CI / PostgreSQL 17 integration (push) Successful in 9m48s
CI / Docker image (push) Successful in 54s
Release / Server image (push) Successful in 1m39s
Owner review 1 R3, R8, R9. A grouped Export step and Render menu; encoding, playback (reverse, boomerang, loops, fades, hold) and still frames; one videos library on the desktop and the server with a verified trash and copies to a videos folder.

Closes #21

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-authored-by: Alberto Balbo <alberto.balbo.96@gmail.com>
2026-11-05 09:18:40 +01:00
Alby96andClaude Opus 5.5 188b2c2e55 feat(editor): visual crop, rotate/mirror/flip/straighten, colour looks (owner review 1 phase 4) (#26)
CI / Build and test (push) Successful in 8m19s
CI / Windows tests and installer (push) Skipped
CI / YAML check (push) Successful in 7s
Release / Build, test and publish (push) Successful in 12m9s
CI / PostgreSQL 16 integration (push) Successful in 7m49s
CI / PostgreSQL 17 integration (push) Successful in 7m19s
CI / Docker image (push) Successful in 46s
Release / Server image (push) Successful in 1m14s
Owner review 1 R5 + R6. Camera rotation, mirror, flip, straighten and crop handles locked to the output; an Exposure Look group; Export output size ("proportions win"); settings format 2 with older-node gates. Also fixes project text and hashes differing between Windows and Linux.

Closes #19
Closes #20

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-authored-by: Alberto Balbo <alberto.balbo.96@gmail.com>
2026-11-05 01:09:09 +01:00
Alby96andClaude Opus 5.5 30a5b03f37 test(decode): wait for the read-ahead before the demand loads that must meet it (#15)
CI / Build and test (push) Successful in 8m36s
CI / Windows tests and installer (push) Skipped
CI / YAML check (push) Successful in 6s
CI / PostgreSQL 16 integration (push) Successful in 11m22s
CI / PostgreSQL 17 integration (push) Successful in 11m38s
CI / Docker image (push) Successful in 54s
The read-ahead starts on the thread pool, so the demand loads could run before it developed a frame and the test failed at random on the shared runner (rc.8's release build and main's CI). The test now waits, within a scaled budget, until the read-ahead has developed a frame of its own.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-authored-by: Alberto Balbo <alberto.balbo.96@gmail.com>
2026-11-04 11:01:19 +01:00
Alby96andClaude Opus 5.5 9b24cf74fc feat: owner review 2 phase 5a: workspace and projects with a local home (#14)
CI / Build and test (push) Successful in 9m43s
CI / Windows tests and installer (push) Skipped
CI / YAML check (push) Successful in 27s
CI / PostgreSQL 16 integration (push) Failing after 8m41s
CI / PostgreSQL 17 integration (push) Successful in 12m37s
CI / Docker image (push) Successful in 56s
Release / Build, test and publish (push) Successful in 14m59s
Release / Server image (push) Successful in 1m51s
Edit opens a sequence as a project of a workspace folder outside the library. Projects have linear version histories kept as sidecars in .chronos/projects/, Main mirrors the sequence's settings, and sync merges setting by setting. Migration 0009, JobKind.WorkspaceCopy = 20, Settings › Workspace, and 241 new strings in 38 languages.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-authored-by: Alberto Balbo <alberto.balbo.96@gmail.com>
2026-11-04 09:22:08 +01:00
Alby96andClaude Opus 5.5 7e4a3b481d feat: owner review 2 phase 4a: Reorganize sequences after import (#12)
CI / Build and test (push) Successful in 9m15s
CI / Windows tests and installer (push) Skipped
CI / YAML check (push) Successful in 6s
Release / Build, test and publish (push) Successful in 15m35s
CI / PostgreSQL 16 integration (push) Successful in 7m26s
CI / PostgreSQL 17 integration (push) Successful in 6m47s
CI / Docker image (push) Successful in 59s
Release / Server image (push) Successful in 1m24s
- Reorganize… on the web panel and the desktop: folder, file and title templates applied to existing sequences, with a dry run and an explicit Apply that runs as a job.
- One naming rule (FrameNaming) for import, upload and Reorganize.
- Crash-safe plan and file journals, held plans, stale-plan refusal; exports move with their folder.
- Writers refuse a folder another program moved or gave to another sequence.
- Server: POST /api/v1/archive/reorganize with a bounded plan cache; template rules.
- Phase 3 docs and translations merged; strings in all 38 languages.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-authored-by: Alberto Balbo <alberto.balbo.96@gmail.com>
2026-10-27 21:58:39 +01:00
Alby96andClaude Opus 5.5 f2b58522b9 refactor!: rename Titano to Chronos and move CI and releases to Gitea (#6)
CI / Build and test (push) Successful in 8m14s
CI / Windows tests and installer (push) Skipped
CI / YAML check (push) Successful in 7s
Release / Build, test and publish (push) Successful in 13m19s
CI / PostgreSQL 16 integration (push) Successful in 4m49s
CI / PostgreSQL 17 integration (push) Successful in 5m28s
CI / Docker image (push) Successful in 53s
Release / Server image (push) Failing after 10s
The owner renamed the product and moved the repository to the self-hosted
Gitea (https://gitea.encke-hake.ts.net/BalboSoft/Chronos) for more control,
and asked for Actions and a first automatic release with the server package
and the Windows exe (docs/requests/2026-10-23-chronos-gitea.md).

- Chronos everywhere: a byte-exact rename of contents and paths, then a
  per-language review of the forms the old name's ending had dictated.
- Gitea instead of GitHub: the update check, licence, issue and support
  links read ChronosReleasesUrl; the update check takes the highest stable
  version, offers a pre-release build its final release and reports a
  repository it cannot see as a failed check. EULA, security policy and
  Gitea issue forms live at the repository root.
- Gitea Actions for the Linux act_runner (.gitea/workflows): CI, release,
  nightly image and performance gates in the .NET SDK container with git
  checkout and the system SQLite. The release cross-compiles the Windows
  programs, checks their icon, version and DPI manifest, packs installers
  and zips, publishes the Gitea release and pushes the server image
  (REGISTRY_TOKEN). Windows-only tests run in an opt-in job on a Windows
  runner (WINDOWS_RUNNER).
- New Chronos.Tools commands: zip, gitea-release, postgres-ci (replaces the
  docker-exec script, which Gitea's service containers do not allow; the
  throw-away server runs without durability) and pe-check.
- Timed tests take their budget from TestTiming (CHRONOS_TEST_TIME_FACTOR,
  3 on the shared runner; the weekly performance gates keep theirs).

BREAKING CHANGE: programs, settings, data folders, file types, environment
variables and the Docker image use the new name; nothing is migrated from
Titano, which never had a release.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-authored-by: Alberto Balbo <alberto.balbo.96@gmail.com>
2026-10-23 12:45:18 +02:00