CI / Build and test (push) Successful in 8m36s
CI / Windows tests and installer (push) Skipped
CI / YAML check (push) Successful in 6s
CI / PostgreSQL 16 integration (push) Successful in 11m22s
CI / PostgreSQL 17 integration (push) Successful in 11m38s
CI / Docker image (push) Successful in 54s
The read-ahead starts on the thread pool, so the demand loads could run before it developed a frame and the test failed at random on the shared runner (rc.8's release build and main's CI). The test now waits, within a scaled budget, until the read-ahead has developed a frame of its own. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> Co-authored-by: Alberto Balbo <alberto.balbo.96@gmail.com>