Files
Khaemhat/docs
Alby96andClaude Opus 5.5 11f69b6111
CI / Build and test (SQLite) (pull_request) Successful in 2m50s
CI / PostgreSQL 16 integration (pull_request) Skipped
CI / PostgreSQL 17 integration (pull_request) Skipped
CI / YAML check (pull_request) Successful in 6s
CI / Docker image (pull_request) Successful in 1m56s
docs: record M4 as closed (v0.4.0) and M5 as the current milestone
STATUS is the resume point of every session; after the M4 merge, tag,
image and release it must point at M5 instead of the pending merge.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-12 13:13:05 +01:00
..