CI / Build and test (pull_request) Failing after 4m5s
CI / PostgreSQL 16 integration (pull_request) Skipped
CI / PostgreSQL 17 integration (pull_request) Skipped
CI / Docker image (pull_request) Skipped
CI / Windows tests and installer (pull_request) Skipped
CI / YAML check (pull_request) Successful in 12s
On the runner's shared storage the 100k-frame bulk insert of the Phase 2 gate took 21-33 s against its 15 s budget: the timed tests should measure the client's COPY path, not the host's disk flushes. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>