The fourth verification round of the matches work found 18 defects in
the merge, Integrate and Matches surfaces. This commit fixes them:
- An Integrate job now carries the planning account's id, so its re-plan
decides ownership the way the dialog did.
- A merge skips only a project the kept sequence holds a real copy of
(name, offset head and history content) and re-points its renders to
that copy.
- A merge runs its trash checks before the Links stage and records an
undo, so an abandoned merge gives the other sequence back its link,
session keys and pairs.
- The metered hold adopts automatic transfers that were paused before a
restart.
- Apply in the Compare dialog re-plans when the plan is pending or stale.
- The Library's Two versions... lists the second versions a Union merge
leaves, each with Drop... (dry run, confirmation, verified partner).
A merge job's Open shows that list.
- The merge's typed confirmation is the invariant count, and the prompt
names it in all 38 languages.
- Italian text uses Principale and Gemello. The Main project is named
through WorkspaceText in the Projects part and in the twin tooltip.
- The session keys tooltip is split into two keys, and To trash... and
Delete on server... say why they are disabled.
- The capture restores the editor account before the Matches scenes.
- Upload again follows SyncHost.CanSendSync (Upload with Edit).
- Matches rows trim archive names in the middle on a rebalanced grid;
the Projects part rows trim, with the full text in the tooltip.
- The sample project targets use ProjectTransplant.FreeName.
DECISIONS, CHANGELOG, STATUS 8.7, the request doc and the 16 changed
capture baselines are updated.
Refs #73
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>