The convert endpoint planned the whole selection inside the HTTP request, again for
every mode, quality keystroke and confirmation, with no limit: behind a proxy an
all-sequence conversion could never get past its dry run or its apply.
- ReorganizePlanCache becomes PlanCache, shared by Reorganize and Convert: one plan
per key made apart from the request, two at once across both kinds, eight kept,
15-minute timeout, 5-minute lifetime, 503 plan_dropped. Keys are typed records
(ReorganizePlanKey, ConvertPlanKey) that also say which exceptions are refusals.
- A conversion plan is keyed by archive, a convert stamp of the index
(SequenceRepository.GetConvertStampAsync: the Reorganize stamp plus, per planned
sequence, the photos' count, sizes, formats, pixel sizes and missing, corrupt,
preview-only and undecodable flags), the sequences and the target with the
quality that counts. Not the mode: the request's mode and options are set on the
kept plan, and the free space is measured again at every request through the
engine. A plan made while the volume was away is not kept (503 archive_offline).
- New sequence holds the converted copies alone: the dry run says the skipped
photos are not copied into it (Archive.Convert.NotCopied.*, Server.Convert.OnPcNew),
the panel's totals, column and confirmation give the count, and so does the
desktop's summary.
- Panel: the preview is asked in Replace's neutral words; a dry run cut off by a
proxy is asked again while the totals show how long it takes, plan_dropped is
retried once; an apply the server let go plans again, a changed one shows
Admin.Convert.PlanChanged, and one with no answer is not resent (its job may be
queued).
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
(cherry picked from commit f0b1e379ce7c08b6d3459ab25ca6214c8f366f6c)