Commit Graph
2 Commits
Author SHA1 Message Date
Alby96andClaude Opus 5.5 2654683a12 fix(workspace): close the phase 5c review findings
Originals are now judged by their bytes, never by the media index: a removal
or clean-up hashes every file under media/originals and deletes it only when
the home holds that SHA-256; every other file, named or not, goes to the
workspace trash. Trash entries are filled under a staging name that Empty
never lists. A ledger can only name files inside exports/.

Jobs follow the workspace: a copy, render or send resolves the folder that
holds its project now (a moved workspace, a retry after a move) and waits
while a move has not switched yet. A clean-up failure after the switch is a
warning that keeps the journal for a later resume; entries that changed
since they were copied are kept, and a same-volume rename refused across
volumes falls back to copy and verify.

Sends map a replayed version by content hash, or go with the project only,
and note an old server that drops provenance. The media index (format 2) and
project file (format 3) refuse older readers while they hold originals.
Metered connections also hold sync downloads and server copies. The editor
gains Send again, the Settings page can resume a stopped move, the disabled
tooltips say why, and unused strings are pruned.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-04 17:32:48 +01:00
Alby96andClaude Opus 5.5 f86630c77a feat(workspace): clean-up of media, size limit and workspace trash
Phase 5c P4. The workspace no longer grows without bound: a daily
workspace-cleanup system schedule (04:30, catch-up) removes the media of
projects in step with their home that were not opened for Clean after,
and the size limit removes the least recently used after each copy.
Each project kept is logged with its reason (open in Edit, not in step,
home offline, jobs pending, renders not sent, unreadable, just copied).

- WorkspaceCleaner: cleans under the project's lease, re-checking every
  condition; the originals the home no longer holds go to the workspace
  trash, never away. The media index is marked Cleaned, so the project
  reads as MediaRemoved and opening it copies the media again.
- WorkspaceTrash: lists entries with a fingerprint, and empties only the
  plan the user confirmed (refused when the trash changed since).
- Trash dialog view model and view: Erase is enabled only after the user
  types the number of entries.
- Removing a copy counts the unsent renders and the last originals. Send
  first queues the renders' sending and refuses the removal until they
  are sent.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-04 15:41:48 +01:00