Commit Graph
3 Commits
Author SHA1 Message Date
Alby96andClaude Opus 5.5 5012c3bbd2 fix(archive): erase replaced originals only on the archive's own word
A conversion counted as deleted when no frame of the sidecar held it, no
tombstone ended its chain and every frame was hashed. A sidecar rebuilt by
adoption meets that after a routine verify although it never knew the
conversion, so the originals were erased, the dry run calling them the last
copy, while the damaged conversion was still in the folder. A sequence found
nowhere and missing from this index counted as gone in the same way, even
when the walk had only skipped its folder (photos without a sidecar), and its
live conversion was never hashed.

A conversion is now deleted only on positive evidence: a Deleted tombstone
ending its chain in the sequence's sidecar, the sequence in the trash, or the
trash's record of erasing it (.chronos/trash/.erased/<id>.json, written
before a deleted sequence's folder goes while a replaced entry of it stays,
swept once none does). Anything else keeps the entry, and its job log line
says what settles it: verify the sequence (a frame never hashed), scan the
archive (a sidecar missing or unreadable), rebuild the index (a row the
archive does not bear out), or restore the entry to keep its photos.

Also:
- a dry run or an emptying walks the archive once for every sequence that
  moved, and again only when a folder it found no longer holds it;
- a download queues the passes a frame swap cleared whatever stops the job
  (JobContext.EnqueueFollowUpAsync with a token), as a restore does;
- the confirmation's detail takes Tab and scrolls from the keyboard when it
  is longer than its card.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-03 09:36:01 +01:00
Alby96 e5508e7e69 feat(data): scheduler engine, schedules table and housekeeping jobs
Owner review 2, R10: every timer that queues work becomes a visible schedule,
so the server and the desktop need one shared engine to run them.

- Migration 0007: schedules table (system rows keyed by system_key) and
  jobs.schedule_id; Job.ScheduleId, JobDto.ScheduleId, JobRepository
  HasPendingAsync / ListPendingTargetsAsync / ListByScheduleAsync.
- ScheduleRepository: seeding that keeps user edits, reset, compare-and-set
  claim of a run (one winner across processes), outcomes.
- Scheduling: in-house recurrence (every/daily/weekly/monthly, DST gap moves
  forward, ambiguous time runs once), ScheduleActions resolving scan, verify,
  thumbnails, proxies, analysis, maintenance, backup, cleanup, duplicates and
  orphans into archive jobs, IScheduleHost, and the Scheduler loop (catch-up,
  clock going back, run now, CRUD as API v1 DTOs).
- New job kinds Backup (16) and Cleanup (17) with handlers, shared clean-up
  steps (job history, audit log, trash report that never deletes) and host
  steps through ArchiveServiceOptions; read-only Duplicates and Orphans report
  handlers, so the server can run those kinds too.
- JobEngine no longer purges history at start: the housekeeping schedule's
  job-history step does; JobEngine.CanRun and an EnqueueAsync with scheduleId.
- Protocol DTOs for schedules; job kind names in en and it.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
(cherry picked from commit eb0edd2483a493db7c6945d5b494461cabb2a4ad)
2026-10-27 02:08:11 +01:00
Alby96andClaude Opus 5.5 f2b58522b9 refactor!: rename Titano to Chronos and move CI and releases to Gitea (#6)
CI / Build and test (push) Successful in 8m14s
CI / Windows tests and installer (push) Skipped
CI / YAML check (push) Successful in 7s
Release / Build, test and publish (push) Successful in 13m19s
CI / PostgreSQL 16 integration (push) Successful in 4m49s
CI / PostgreSQL 17 integration (push) Successful in 5m28s
CI / Docker image (push) Successful in 53s
Release / Server image (push) Failing after 10s
The owner renamed the product and moved the repository to the self-hosted
Gitea (https://gitea.encke-hake.ts.net/BalboSoft/Chronos) for more control,
and asked for Actions and a first automatic release with the server package
and the Windows exe (docs/requests/2026-10-23-chronos-gitea.md).

- Chronos everywhere: a byte-exact rename of contents and paths, then a
  per-language review of the forms the old name's ending had dictated.
- Gitea instead of GitHub: the update check, licence, issue and support
  links read ChronosReleasesUrl; the update check takes the highest stable
  version, offers a pre-release build its final release and reports a
  repository it cannot see as a failed check. EULA, security policy and
  Gitea issue forms live at the repository root.
- Gitea Actions for the Linux act_runner (.gitea/workflows): CI, release,
  nightly image and performance gates in the .NET SDK container with git
  checkout and the system SQLite. The release cross-compiles the Windows
  programs, checks their icon, version and DPI manifest, packs installers
  and zips, publishes the Gitea release and pushes the server image
  (REGISTRY_TOKEN). Windows-only tests run in an opt-in job on a Windows
  runner (WINDOWS_RUNNER).
- New Chronos.Tools commands: zip, gitea-release, postgres-ci (replaces the
  docker-exec script, which Gitea's service containers do not allow; the
  throw-away server runs without durability) and pe-check.
- Timed tests take their budget from TestTiming (CHRONOS_TEST_TIME_FACTOR,
  3 on the shared runner; the weekly performance gates keep theirs).

BREAKING CHANGE: programs, settings, data folders, file types, environment
variables and the Docker image use the new name; nothing is migrated from
Titano, which never had a release.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-authored-by: Alberto Balbo <alberto.balbo.96@gmail.com>
2026-10-23 12:45:18 +02:00