Commit Graph
5 Commits
Author SHA1 Message Date
Alby96andClaude Opus 5.5 d472dfdec1 feat: phase 5 groundwork (playback format 3, videos contracts, migration 0010, strings)
Lays down every contract the later parcels of owner review 1 phase 5 build on,
so they compile against shared types without touching each other's files.

- Settings format 3: export.playback (direction, loops, fades, hold), omitted
  at its default and member by member; RequiredFormat is 3 only while used.
- OutputProgram public API with a forward-only body; still-frame job
  parameters (StillFrame, StillPhoto) routed to format-3 nodes only.
- Render.Sha256/Kind, RenderCopy, RenderKind; JobKind.VideoCopy = 24.
- Migration 0010 (sqlite, postgres): renders.sha256/kind, ix_renders_created,
  render_copies without a foreign key.
- Videos protocol DTOs, client calls, ServerCapabilities.Videos (declared,
  not announced yet), ServerSettingsDto.VideosPath.
- IVideoLibrary with a NotImplemented stub registered on the server;
  TrashKind.Videos, VideoTrashNames, VideoErrors.
- en and it strings for the whole phase, five icons, decisions 1-22 and the
  open-question defaults; tests that used format 3 as "newer" now use 4.

Refs #21

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-05 01:48:33 +01:00
Alby96andClaude Opus 5.5 188b2c2e55 feat(editor): visual crop, rotate/mirror/flip/straighten, colour looks (owner review 1 phase 4) (#26)
CI / Build and test (push) Successful in 8m19s
CI / Windows tests and installer (push) Skipped
CI / YAML check (push) Successful in 7s
Release / Build, test and publish (push) Successful in 12m9s
CI / PostgreSQL 16 integration (push) Successful in 7m49s
CI / PostgreSQL 17 integration (push) Successful in 7m19s
CI / Docker image (push) Successful in 46s
Release / Server image (push) Successful in 1m14s
Owner review 1 R5 + R6. Camera rotation, mirror, flip, straighten and crop handles locked to the output; an Exposure Look group; Export output size ("proportions win"); settings format 2 with older-node gates. Also fixes project text and hashes differing between Windows and Linux.

Closes #19
Closes #20

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-authored-by: Alberto Balbo <alberto.balbo.96@gmail.com>
2026-11-05 01:09:09 +01:00
Alby96andClaude Opus 5.5 efa87f68ce feat: owner review 2 phase 4b: mass conversion after import (#13)
CI / Build and test (push) Failing after 3m1s
CI / PostgreSQL 16 integration (push) Skipped
CI / PostgreSQL 17 integration (push) Skipped
CI / Docker image (push) Skipped
CI / Windows tests and installer (push) Skipped
CI / YAML check (push) Successful in 10s
Release / Build, test and publish (push) Successful in 15m31s
Release / Server image (push) Successful in 1m13s
Convert photos already in the archive to JPEG, TIFF-16 or Linear DNG, from the panel's Library and the desktop's Archive and Library. Each run asks Replace (same frames, originals to the trash, recoverable) or New sequence. A dry run lists what converts, what is skipped and why, size before and after, and free space; the job converts exactly the confirmed photos, resumes, and commits all or nothing per sequence. A conversion never changes what Chronos reads from a photo. Replaced originals are erased only on the archive's own word that their conversion is gone. Desktop TIFFs that WIC showed black or as noise now go to the managed reader; the Edit picker no longer spins a core.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-authored-by: Alberto Balbo <alberto.balbo.96@gmail.com>
2026-11-03 10:41:50 +01:00
Alby96andClaude Opus 5.5 9aa818ed47 feat: owner review 2 phase 3: Library on the web panel, photo trash and web upload (#11)
CI / Build and test (push) Successful in 7m25s
CI / Windows tests and installer (push) Skipped
CI / YAML check (push) Successful in 10s
CI / PostgreSQL 16 integration (push) Successful in 5m20s
CI / PostgreSQL 17 integration (push) Successful in 5m22s
CI / Docker image (push) Successful in 50s
Release / Build, test and publish (push) Successful in 12m1s
Release / Server image (push) Successful in 1m26s
- Web panel Library: browse, view, delete sequences and photos, mass operations (analyse, proxies, thumbnails, verify, retag, delete, CSV). It never edits the video.
- Photo trash with tombstones (migration 0008): crash-safe delete and restore, hash-checked restore with reasons, and emptying only by an explicit fingerprinted job. Sync and uploads keep deleted photos deleted; an explicit "Upload again" brings one back.
- Upload from the web panel: in-house SHA-256 in a worker with a fail-closed self-test, capture time from EXIF, chunked, resumable; no folders.
- Desktop trash dialog with photo entries and Empty.
- Admin files are revalidated (no-cache + ETag).

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-authored-by: Alberto Balbo <alberto.balbo.96@gmail.com>
2026-10-27 15:08:39 +01:00
Alby96andClaude Opus 5.5 f2b58522b9 refactor!: rename Titano to Chronos and move CI and releases to Gitea (#6)
CI / Build and test (push) Successful in 8m14s
CI / Windows tests and installer (push) Skipped
CI / YAML check (push) Successful in 7s
Release / Build, test and publish (push) Successful in 13m19s
CI / PostgreSQL 16 integration (push) Successful in 4m49s
CI / PostgreSQL 17 integration (push) Successful in 5m28s
CI / Docker image (push) Successful in 53s
Release / Server image (push) Failing after 10s
The owner renamed the product and moved the repository to the self-hosted
Gitea (https://gitea.encke-hake.ts.net/BalboSoft/Chronos) for more control,
and asked for Actions and a first automatic release with the server package
and the Windows exe (docs/requests/2026-10-23-chronos-gitea.md).

- Chronos everywhere: a byte-exact rename of contents and paths, then a
  per-language review of the forms the old name's ending had dictated.
- Gitea instead of GitHub: the update check, licence, issue and support
  links read ChronosReleasesUrl; the update check takes the highest stable
  version, offers a pre-release build its final release and reports a
  repository it cannot see as a failed check. EULA, security policy and
  Gitea issue forms live at the repository root.
- Gitea Actions for the Linux act_runner (.gitea/workflows): CI, release,
  nightly image and performance gates in the .NET SDK container with git
  checkout and the system SQLite. The release cross-compiles the Windows
  programs, checks their icon, version and DPI manifest, packs installers
  and zips, publishes the Gitea release and pushes the server image
  (REGISTRY_TOKEN). Windows-only tests run in an opt-in job on a Windows
  runner (WINDOWS_RUNNER).
- New Chronos.Tools commands: zip, gitea-release, postgres-ci (replaces the
  docker-exec script, which Gitea's service containers do not allow; the
  throw-away server runs without durability) and pe-check.
- Timed tests take their budget from TestTiming (CHRONOS_TEST_TIME_FACTOR,
  3 on the shared runner; the weekly performance gates keep theirs).

BREAKING CHANGE: programs, settings, data folders, file types, environment
variables and the Docker image use the new name; nothing is migrated from
Titano, which never had a release.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-authored-by: Alberto Balbo <alberto.balbo.96@gmail.com>
2026-10-23 12:45:18 +02:00