Commit Graph
2 Commits
Author SHA1 Message Date
Alby96andClaude Opus 5.5 b34b6b6fe0 fix(copies): close the owner review 6 verification findings
A merge could still trash photos it never verified, resume against a
pair the user had answered meanwhile, and take different unhashed
photos for copies; the dialog and the lists worded several facts
wrongly or lost them on refresh.

- Merge: a retry resumes only while the pair is still the job's;
  Verify requires the other archive online and its folder in place,
  stops on an unreadable photo, files a differing unhashed photo as a
  second version and must cover every frame before Trash; the plan
  hashes unmatched unhashed photos first, lists "Deleted in the other"
  and names the relinked servers; second versions stay discoverable
  (CopySides.VersionsAsync).
- Integrate: a retry after a failure before the journal runs again.
- Sync: a sequence back after a 404 stays Linked while its link holds;
  a local cull no longer asks for attention.
- Block lines of both planners name the right sequence, archive,
  server and space through one formatter.
- Compare dialog: one Details row per setting with worded values,
  Projects headings, Choose focuses the kept-sequence radios, the
  photo selection reaches rows outside the viewport, the Replace
  confirmation lists the losers per side, plan lines read as queued.
- Matches and Library: counts first and grouped, integrating shown as
  a share, local matches name the other archive, the Library keeps its
  match and "deleted on server" statuses across a refresh.

Refs #73

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-17 15:02:39 +01:00
Alby96andClaude Opus 5.5 06b826e39d feat(app): matches list, compare dialog, settings rows, library and picker surfaces (owner review 6, P6)
Server > Matches shows the pairs the copy engine found (same sequence on the
server and this PC, or twice here), attention first, with the design 8.1
actions; Keep apart and Unlink toast with Undo. The in-window Compare dialog
walks photos, details, projects and the plan, blocks until details are
chosen, and confirms only what replaces or merges (typed count for a merge).
Sync rows of an unanswered pair read "match found" and offer Compare first;
Upload all local skips suspected copies and says why. Settings > Server gains
Link matches, Integrate photos and Integrate projects. Library cards carry the
match status with Compare..., the sequence picker marks twins, and Jobs opens
Integrate and Merge targets. The sample engine and capture scenes render every
state; tests cover the text rules and the screens.

Refs #73

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-16 20:29:07 +01:00