Commit Graph
5 Commits
Author SHA1 Message Date
Alby96andClaude Opus 5.5 aad8ae46dd fix(copies): close the eighth verification round of owner review 6
- A merge's Renders stage never deletes what sits at a journaled render
  target: a file or folder it did not copy there (a render of the kept
  sequence made after a failed run), or a path another render of the kept
  sequence names, makes the copy take a new free name instead.
- A merge's Verify stage records the hash it read for each kept frame the
  index had none for, the Details stage leaves the versions the verify filed
  out of Main, and Two versions also lists a whole-second instant holding two
  frames of one size and other content (owner Q3).
- The Integrate journal keeps the losers the plan listed as last copies; a
  loser that became the only copy while the job ran is never trashed: the
  journal goes and the job fails as a stale plan.
- Download originals of a server sequence whose earlier download was
  unlinked or kept apart makes a new local sequence under a key of the job,
  instead of filling the old one, re-linking it and overwriting its details.
- An upload never links again from its checkpoint a server sequence the user
  kept apart since the attempt that made it.

Refs #73

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-18 11:38:18 +01:00
Alby96andClaude Opus 5.5 123ceba845 fix(copies): close the seventh verification round of owner review 6
- A merge plan hashes the kept sequence's unhashed frames that match a hashed
  photo of the other by size and time: the same content is no longer a false
  last copy, and another content is copied in as a second version instead of
  going to the trash with the other sequence.
- The Replace stage trashes a losing version of the kept sequence only while
  another sequence still holds it or the plan listed it as a last copy;
  otherwise the journal goes and the job fails as a stale plan.
- A details conflict at the merge's or the Integrate's Details stage drops
  the journal, so a retry plans again instead of failing the same way.
- The Integrate's Projects stage keeps a project for good only for a
  permanent refusal; a server out of reach fails the job with the journal
  kept, and the retry finishes the same copy.
- A pair read as deleted on the server is cleared when the server lists it
  again or a link to that sequence is made.
- An upload of a sequence kept apart from a server sequence goes under a
  session key of the job, making a new server sequence; a link made over a
  kept-apart pair moves it to Linked.

Refs #73

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-18 10:45:11 +01:00
Alby96andClaude Opus 5.5 9657c1711d fix(copies): close the owner review 6 second verification findings
Upload again now deletes the gone pair row once the new sequence is linked, so
the pair stops reading "deleted on server" or "kept here". A linked upload the
server refuses into its sequence (403 for an account without Edit that does not
own it) falls back to ordinary uploads instead of failing; an Integrate that
would add photos to such a sequence is blocked in its plan (NoAddRight).
Automatic photo transfers pause on a metered connection whatever the option
says. Integrate trashes server photos only against the manifest version that
checked the winner, and a merge is blocked while the other sequence holds a
damaged photo nothing else holds (DamagedPhotos), so nothing unverified reaches
the trash.

The plan and the confirmations now say what really happens: replaced versions
are no longer counted as kept, a merge lists the kept sequence's replaced
photos, plan lines use the text colour, an integrated pair that left photos out
says new photos move by hand, and a merging pair reads "merging" with its
progress. The Compare dialog gets per-side tooltips, class sizes for both
sides, policy-aware class tooltips, column headings and readable file names;
the sync table shows "deleted there" with Review and warns on skipped rows; the
Edit picker names the server, the Library card shows the match status second,
a deleted server sequence is named instead of "0 photos", and the match
tooltips stop calling a sequence a copy. The capture scenes use the server
name, the link names and consistent sample sizes.

Refs #73

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-17 16:08:49 +01:00
Alby96andClaude Opus 5.5 fe752a0a21 fix(copies): address the owner review 6 findings
The review of the found-copies work showed pairs that could stick, jobs that
could act on a pair the user had answered otherwise, and detection gaps:

- forgetting a link on an address-keyed server deletes the pair and Candidate
  rows of that remote and resets the probe, so the sequence is found again
  when it is back; a Linked/Integrated row with no link is asked again
- 404s count only on id-keyed servers, at most once per recheck interval
- probes store the server's newest update time (copy_probes.server_newest,
  migration 0012) instead of comparing with this PC's clock; the lookup
  sample carries hashed photos by size and capture time too, for servers
  that have not hashed their copy
- the older-server gate no longer re-compares unchanged manifests
- a failed Integrate keeps its job id so a retry resumes only an untouched
  pair; cancel and stale plans release the pair (ReleaseAsync)
- automatic photo transfers never create or retarget a sequence
- a first upload files photos the server holds elsewhere into the new
  sequence
- Unlink re-compares before keeping apart; Trash here names only true last
  copies; Drop... trashes one version on both sides after re-checking the
  other
- a merge keeping the pair's other sequence swaps the dialog's columns and
  re-keys Different choices; Upload all reads every pair

Each fix has a regression test where it makes sense.

Refs #73

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-17 13:12:00 +01:00
Alby96andClaude Opus 5.5 461dfcf4a3 feat(copies): integrate local and server, filtered transfers, project transplant (owner review 6, P3)
A local sequence and its server twin can now be integrated into one linked
pair by a resumable job instead of by hand. The planner runs the dry run of
design 5c: photo steps per policy (the wins policies decide only the Different
class; Only here and Only there always move), left out and AutoPhotos, last
copies, the one portable payload, projects copied across under free names,
space, rights and every block, and a fingerprint the job checks again.

The Integrate job keeps an atomic journal and resumes at each stage: link,
photos both ways through filtered transfers that never create or retarget a
server sequence (a 404 marks the pair remote gone), trash only once the winner
is present (locally through the photo trash inside the job, on the server at
the version its dry run read), the agreed details, then projects through
ProjectTransplant. Refusals are kept and reported; a failure or a cancel sets
the pair back to Linked or its previous state.

Linked uploads now file into their target when the server announces
upload-into. The plan context travels with the job so rights and names give
the same plan on the job side.

Refs #73

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-17 11:24:18 +01:00