fix(convert): the job converts exactly the photos its preview listed, once
A conversion job could still do something its confirmed dry run did not show, or refuse what it should have converted: - An upload landing between the confirmation and the sequence's turn made the sequence Changed at every retry. Each ConvertSequence now names the photos the plan converts (Photos, their frame ids); the job takes those from its re-plan, checks their content against the confirmed digest and leaves photos that came in since as they are. A photo the plan did not list is never converted, whatever changed on disk or in the index since the dry run. - A file another program held during the dry run was planned as Missing and then converted or not depending on the re-plan. It is now its own reason (inaccessible, "held open or cannot be opened"); a truncated file reads as undecodable. At job time a confirmed photo that cannot be opened leaves the sequence Blocked for the retry; a held photo the job does not convert does not hide a real change. - The same sequences could be converted twice (two dialogs or tabs, a lost answer, no dry run at all). MassConverter.QueueAsync checks the queued, running and paused conversions and queues under one lock, in the caller's context (the desktop's enqueue shows a toast on the UI thread); a job's own re-plan treats sequences of conversions queued before it as busy. - The per-photo space check reserved a full batch of photos even when fewer were left, so a job whose preview had the space could stop at every retry. It now reserves the photo and those after it that may convert at once. - New sequence now says in the dry run, the panel's totals and confirmation, and a new desktop confirmation, how many photos each new sequence lacks; only sequences that are copied use those words. - On the server, a confirmation takes only the plan kept for the index as it is now (503 plan_dropped otherwise, never a plan made inside the request), and busy sequences and free space are as they are at every request. The panel's Apply asks the dry run again first, with Close still available, and confirms only the same fingerprint. - Maintenance keeps another host's conversion staging as long as its journal and purges both together; the unstaged-copy failure and blocked sequences are logged in catalog sentences. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> (cherry picked from commit fefd9c34ebfeed1f9e84161610ef286026d38355)
This commit is contained in:
1 parent
5b5acaf307
commit
c669d0504d
25 files changed
+1307
-226
No files matched your search
@@ -10,12 +10,14 @@ namespace Chronos.Data.Archiving.Jobs;
|
||||
/// <see cref="JobKind.Convert"/>: a mass conversion (owner review 2, R7; BRIEF §12.5) of the sequences of a confirmed plan
|
||||
/// (<see cref="ConvertJobParameters"/>) through <see cref="MassConverter"/>, which settles what a crash left half-way, refuses
|
||||
/// when the volume lacks the space (measured again before each sequence and each photo), and converts one sequence at a
|
||||
/// time, each all or nothing and only while the photos it converts are those confirmed; its journal makes every stage
|
||||
/// resumable. Progress counts photos; the checkpoint only marks a resume, the journal says where. Each sequence whose frames
|
||||
/// were replaced is told as <c>converted</c>, each new sequence as <c>created</c> (<see cref="ArchiveServiceOptions.SequenceChanged"/>),
|
||||
/// and the passes it needs (light analysis, a deep one when the source had it, thumbnails and proxies) are queued as
|
||||
/// follow-ups, as soon as it is done. Sequences left as they were (changed after the plan, busy, a photo that failed) are
|
||||
/// logged and fail the job at the end, after the others are converted; a retry tries them again with what they staged.
|
||||
/// time, each all or nothing, the photos confirmed alone and only while each holds the content confirmed (photos that came
|
||||
/// in since stay as they are); its journal makes every stage resumable. Progress counts photos; the checkpoint only marks a
|
||||
/// resume, the journal says where. Each sequence whose frames were replaced is told as <c>converted</c>, each new sequence
|
||||
/// as <c>created</c> (<see cref="ArchiveServiceOptions.SequenceChanged"/>), and the passes it needs (light analysis, a deep
|
||||
/// one when the source had it, thumbnails and proxies) are queued as follow-ups, as soon as it is done. Sequences left as
|
||||
/// they were (changed after the plan, busy, a photo another program holds, a photo that failed) are logged and fail the
|
||||
/// job at the end, after the others are converted; a retry tries again those busy, held or failed, with what they staged,
|
||||
/// and leaves one that changed after the plan as it is (its log line says to plan again).
|
||||
/// </summary>
|
||||
internal sealed class ConvertJobHandler(ChronosDatabase db, MassConverter converter, Func<Guid, string, CancellationToken, Task>? sequenceChanged) : IJobHandler
|
||||
{
|
||||
|
||||
Reference in new issue