docs: deploy guide, owner review 4 request (phase 6)

Owner review 1 phase 6 asks for Docker, Unraid and deploy documentation. docs/deploy/
now covers the image tags, volumes, every CHRONOS_* variable with its default, ports and
public ports (the owner's host 8087/8444 mapping), TLS modes and the fingerprint,
upgrades and forward-only migrations, backup and restore, PostgreSQL, troubleshooting,
and the desktop Setup, portable mode and update channel.

The owner review 4 request (2026-11-06) is recorded with its interpretation and plan;
BRIEF §14.9 lists CHRONOS_TRUSTED_PROXIES, which the server already read, §19.6 points
to the Unraid guide, and §24 gains the rows of owner review 4 and phase 6. STATUS shows
both in progress for v0.1.0-rc.14, then v1.0.0.

Refs #22

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
Alby96andClaude Opus 5.5 committed 2026-11-06 16:53:01 +01:00
1 parent fe50b87726
commit b4c2f5805b
10 files changed
+563 -9

No files matched your search

+1 -1
View File
@@ -63,6 +63,6 @@
| 3b | R7 Edit section ("Sequenza" → "Modifica"), sequence picker, guided path from analysis to export | done 2026-10-16: BRIEF §4.1, §10.2, §12.1, §12.3, §24; four DECISIONS rows (the rename, the path, the step rules, the picker); DESIGN §4 step bar and §7; `Editor.html` with the step bar and every mockup's rail label; `i18n/GLOSSARY.md` and the 36 language glossaries (Edit, Path, Step, Findings); the new strings in all 38 languages | `5aeb6aa` |
| 4 | R5 visual crop, proportions win; R6 transforms, straighten, colour filters | done 2026-11-04, released as `v0.1.0-rc.12` (issue #19; one adversarial review round, 30 findings, all confirmed and fixed, and a final check that fixed one more; strings in all 38 languages; 31 screenshot baselines accepted; the line-end fix of issue #20 on the way): BRIEF §10.3, §11.2, §11.4, §12.3, §14.3, §14.7, §24; 32 DECISIONS rows dated 2026-11-04 (conditional settings format and the rule for future members; orientation members and order; the cover zoom; crop coordinates; the locked crop; a quarter turn keeps the content; proportions win, also for an advised aspect, not format-gated in storage; routing format and the server's announcement; the colour look and its values; no ninth step; raw thumbnails; Source framing; global only; the compatibility matrix; groundwork details; crop values; the advisor on the view; routing errors; encoder limits either way round; desktop gates; the crop on the preview; Camera, Look and Export rows; visuals; strings, icons and captures; the review's routing, gates and editing fixes); CHANGELOG [Unreleased] with the upgrade note and the known limitations, and the 5c entries under [0.1.0-rc.11]; ARCHITECTURE geometry, colour, render size and format, gates; DESIGN setting rows, crop overlay and icons; STATUS 8.1 | `188b2c2e` |
| 5 | R3 export panel and Render menu; R8 export options; R9 videos library (desktop, server API, admin page, copy folder, trash) | done 2026-11-05, to be released as `v0.1.0-rc.13` (issue #21; plan `docs/plans/or1-phase-5.md`; groundwork, seven parallel parcels and an integration, then one adversarial review round whose findings are all fixed; strings in English and Italian, the other 36 languages imported before the release): BRIEF §5, §7, §11.1, §11.3, §11.4, §11.5, §12.1, §12.3, §12.5, §12.8, §12.10 (new: Videos), §14.3, §14.6, §14.7, §14.8, §14.9, §19.6, §24; 41 DECISIONS rows dated 2026-11-05 (the plan's 22 decisions and the open questions' defaults; groundwork contracts; workspace stills and sync hashes; the review's trash moves, free names, routing floor, encoder warnings and Videos layout; fades limited together, the hold in whole periods, still contents and 16-bit TIFF; the server videos folder and Docker choices; the copy priority; batch playback routing; the desktop Videos section's choices; the trash entry title; the Export step and Render menu details); CHANGELOG [Unreleased] with the upgrade note (shortcuts, settings format 3, older nodes, `CHRONOS_VIDEOS_PATH`, `/videos`) and the known limitations, and the phase 4 entries under [0.1.0-rc.12]; ARCHITECTURE output program, still, videos library, trash area, copy job, Videos section and endpoints; DESIGN collapsible groups, preset table, two-line menu entries, Videos; mockups `Export.html` (new layout and the Render menu), `Videos.html`, `AdminVideos.html` and the Videos rail entry; STATUS 8.1 | this PR |
| 6 | Docker/Unraid/deploy docs, BRIEF §24 amendments, full verification | todo | |
| 6 | Docker/Unraid/deploy docs, BRIEF §24 amendments, full verification | in progress 2026-11-06, with owner review 4 (`docs/requests/2026-11-06-owner-review-4.md`), to be released as `v0.1.0-rc.14` (issue #22): the deploy guide `docs/deploy/` (README, `docker.md`, `unraid.md`, `desktop.md`); BRIEF §14.9, §19.6, §24 (every amendment since owner review 1 listed); full verification before the release | |
Each phase updates BRIEF (amended paragraphs), DECISIONS, CHANGELOG, STATUS and this file before its commit.
+1 -1
View File
@@ -44,4 +44,4 @@ Two screenshots came with it: the Unraid template (repository `chronos-server:ni
|---|---|---|---|
| 1 | R1 ports, R2 baselines | done 2026-11-04, released as `v0.1.0-rc.9` (one review round with two reviewers and a checker; strings in all 38 languages): BRIEF §12.7, §14.8, §14.9, §19.6; DECISIONS rows dated 2026-11-04 (public ports as settings, the settings DTO members, the container port lock, saved listening ports removed, the client address, one address rule, the Chronos identity checks, the HTTP port typed as HTTPS, the zone index, Host networking, baselines from the development PC, fixed capture values); CHANGELOG [Unreleased] with the Unraid upgrade note | `255e1490` |
| 2 | R4 owner review 2 phases 5b and 5c | done 2026-11-04: 5b released as `v0.1.0-rc.10` (`81c303f4`), 5c as `v0.1.0-rc.11` (`db389a54`) | `81c303f4` (5b), `db389a54` (5c) |
| 3 | R4 owner review 1 phases 4–6, then `v1.0.0` | in progress: phase 4 done 2026-11-04, released as `v0.1.0-rc.12` (issue #19, `188b2c2e`); phase 5 done 2026-11-05, to be released as `v0.1.0-rc.13` (issue #21); phase 6 (#22) and `v1.0.0` (#23) todo | `188b2c2e` (phase 4) |
| 3 | R4 owner review 1 phases 4–6, then `v1.0.0` | in progress: phase 4 done 2026-11-04, released as `v0.1.0-rc.12` (issue #19, `188b2c2e`); phase 5 done 2026-11-05, to be released as `v0.1.0-rc.13` (issue #21); phase 6 (#22) in progress for `v0.1.0-rc.14` with owner review 4 (2026-11-06); `v1.0.0` (#23) todo | `188b2c2e` (phase 4) |
@@ -0,0 +1,44 @@
# Owner review 4 (2026-11-06)
## Owner's text (verbatim, Italian)
> Lasciamo un attimo da parte la questione delle licenze ma segnati quello che mi hai detto in un lavoro o un progetto
> perchè sarà da implementare.
>
> Metti a posto la repository su Gitea inserendo anche i lavori vecchi e la documentazione iniziale con gli sceen.
> Puoi trovare la documentazione originale in "A:\Download\files.zip".
>
> Inoltre aggiungi questee modifiche:
>
> * aggiungi anche un parte che permette di avere un elenco di tutti i video creati e/o pubblicati, separando
> pubblicazione da area di lavoro come se fosse una bacheca del lavoro svolto
> * togli l'invio di dati di diagnostica per migliorare il programma. Non lo voglio (anche perchè non saprei dove
> inviare i dati)
> * nel percorso che viene passato come percorso dell'archivio assicurati di creare al suo interno tutta la struttura
> di cartelle proprie dell'archivio (sia che sia in docker sul server sia che si su windows)
>
> Riprendi la fase 6 e v1.0.0.
> Fermati al 75% dell'uso settimanale.
## Interpretation
| Id | Request | Working interpretation |
|---|---|---|
| R1 | A board of the work done (issue #29) | One list of every video made or published, the published ones (in the library, on this PC's archive or the server) apart from the work still in a workspace, like a board of finished work: the desktop's Videos section and the admin panel's Videos page. |
| R2 | No diagnostic data sent (issue #30) | The only data Chronos could send by itself is the anonymous usage counts (Settings › General › *Send anonymous counts*, the consent of BRIEF §21): removed with their setting and strings. The diagnostics zip stays: the user saves it by hand and attaches it to a bug report if they choose; it is never sent. |
| R3 | The archive's folder structure inside the archive path (issue #31) | When an archive path is chosen or the server starts on one (the desktop on Windows, the server in Docker or on Windows), Chronos creates the archive's whole structure inside it at once (`.chronos/` with `archive.json` and its folders), rather than folder by folder as work first needs them. |
| R4 | Put the Gitea repository in order | The earlier work recorded on Gitea as closed issues (#32–#54, one per phase or fix, each in its release's milestone, `v0.1.0-rc.1` … `v0.1.0-rc.11`); the original documentation of `files.zip` (the first brief, design kit, screen mockups and icon sheet, then named Titano) kept frozen under `docs/reference/original` (`fe50b877`). |
| R5 | Licensing set aside, recorded | The business model and licensing proposed in owner review 3 (R5) recorded in issue #24 (milestone `v1.0.0`), to be implemented later; Phase 9 (BRIEF §21, §22) still waits for the owner's explicit approval. |
| R6 | Resume phase 6 and `v1.0.0` | Owner review 1 phase 6 (issue #22: the Docker, Unraid and deploy guide, BRIEF §24, full verification) together with R1–R3 in `v0.1.0-rc.14`, then `v1.0.0` (issue #23). Work stops at 75% of the weekly usage (the rule was 60%). |
## Questions and answers
None asked: R1–R3 follow the owner's words and earlier answers (owner review 1: one videos library, desktop and server).
The owner corrects an interpretation at the next review.
## Delivery plan
| Phase | Content | State | Commit |
|---|---|---|---|
| 1 | R1 work board (#29), R2 usage counts removed (#30), R3 archive folder structure (#31); R4 repository; R5 #24; owner review 1 phase 6 (#22): `docs/deploy/` (Docker, Unraid, desktop), BRIEF §14.9, §19.6, §24 | in progress, to be released as `v0.1.0-rc.14` | |
| 2 | `v1.0.0` (#23), the first stable release (owner review 3, R4) | todo | |