fix: stalled jobs, editor cancellation stops and GoPro DNG decoding

Owner review 1, phase 1 (docs/requests/2026-10-15-owner-review-1.md).

Thumbnail and proxy jobs over several sequences counted sequences while
they checkpointed inside one: the rate decayed until the time left
overflowed TimeSpan, the job failed while publishing progress and again
while saving it, and stayed Running. The throughput is now seeded by the
first window with progress, the time left is bounded (JobEta), saving
progress never throws, image passes count frames, and job speeds use the
right unit (bytes for verify and import).

The debugger stops in WicDecoderProvider.cs when presets changed were
cancelled preview decodes leaving synchronous thread-pool delegates; the
editor's sources, LatestRunner and the render node's proxy task now keep
them in their own tasks, and a cancellation is never an unreadable frame.

GoPro DNGs converted by Adobe software were classified GPR and read only
through their 8-bit preview, and Windows' preview-only DNG decoder was
reported as a native decode. A DNG is GPR only when its raw image is
VC-5, WIC decodes RAW only through the Raw Image Extension and never DNG,
analyses and previews take an adequate embedded preview by choice while
renders develop natively, and frames already indexed as GPR are
reclassified by the next light analysis.

Also records the owner's request (docs/requests), the BRIEF amendments
(§8.1, §8.2, new §24), DECISIONS, CHANGELOG, STATUS and ARCHITECTURE.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
Alby96andClaude Opus 5.5 committed 2026-10-16 10:20:26 +02:00
1 parent 19265b36c2
commit 34d03051f5
77 files changed
+785 -94

No files matched your search

+12
View File
@@ -0,0 +1,12 @@
# Owner change requests
One file per request from the product owner, named `<date>-<slug>.md`. Each file keeps:
1. the owner's text, verbatim;
2. the working interpretation, numbered (R1, R2, …);
3. the questions asked and the owner's answers;
4. the delivery plan, phase by phase, with each phase's state, commit, BRIEF/DESIGN sections amended and DECISIONS rows.
A request amends the BRIEF: the amended paragraphs say so, and BRIEF §24 lists every amendment with the request that
made it. DECISIONS rows written for a request cite it (`R4`, `owner review 1`). Read the request file first to rebuild
why a part of Titano is the way it is.