docs(i18n): translate the phase 5b strings and split the changelog by release
CI / Build and test (pull_request) Successful in 8m15s
CI / Windows tests and installer (pull_request) Skipped
CI / YAML check (pull_request) Successful in 10s
CI / PostgreSQL 16 integration (pull_request) Successful in 8m46s
CI / PostgreSQL 17 integration (pull_request) Successful in 9m51s
CI / Docker image (pull_request) Successful in 1m45s
CI / Build and test (pull_request) Successful in 8m15s
CI / Windows tests and installer (pull_request) Skipped
CI / YAML check (pull_request) Successful in 10s
CI / PostgreSQL 16 integration (pull_request) Successful in 8m46s
CI / PostgreSQL 17 integration (pull_request) Successful in 9m51s
CI / Docker image (pull_request) Successful in 1m45s
The 119 new phase 5b strings are translated into the 36 machine-translated languages. The changelog separates what shipped in 0.1.0-rc.9 (ports and baselines) from the unreleased phase 5b work, and the index settings decision names the rare cases where a newer project.json is kept as version 1. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
1 parent
2068656f44
commit
31df8beb9a
219 files changed
+4330
-23
No files matched your search
@@ -42,6 +42,6 @@ Two screenshots came with it: the Unraid template (repository `chronos-server:ni
|
||||
|
||||
| Phase | Content | State | Commit |
|
||||
|---|---|---|---|
|
||||
| 1 | R1 ports, R2 baselines | in progress, to be released as `v0.1.0-rc.9` | |
|
||||
| 2 | R4 owner review 2 phases 5b and 5c | todo | |
|
||||
| 1 | R1 ports, R2 baselines | done 2026-11-04, released as `v0.1.0-rc.9` (one review round with two reviewers and a checker; strings in all 38 languages): BRIEF §12.7, §14.8, §14.9, §19.6; DECISIONS rows dated 2026-11-04 (public ports as settings, the settings DTO members, the container port lock, saved listening ports removed, the client address, one address rule, the Chronos identity checks, the HTTP port typed as HTTPS, the zone index, Host networking, baselines from the development PC, fixed capture values); CHANGELOG [Unreleased] with the Unraid upgrade note | `255e1490` |
|
||||
| 2 | R4 owner review 2 phases 5b and 5c | 5b done 2026-11-04, to be released as `v0.1.0-rc.10`; 5c todo | |
|
||||
| 3 | R4 owner review 1 phases 4–6, then `v1.0.0` | todo | |
|
||||
Reference in new issue
Block a user