fix(copies): close the seventh verification round of owner review 6
- A merge plan hashes the kept sequence's unhashed frames that match a hashed photo of the other by size and time: the same content is no longer a false last copy, and another content is copied in as a second version instead of going to the trash with the other sequence. - The Replace stage trashes a losing version of the kept sequence only while another sequence still holds it or the plan listed it as a last copy; otherwise the journal goes and the job fails as a stale plan. - A details conflict at the merge's or the Integrate's Details stage drops the journal, so a retry plans again instead of failing the same way. - The Integrate's Projects stage keeps a project for good only for a permanent refusal; a server out of reach fails the job with the journal kept, and the retry finishes the same copy. - A pair read as deleted on the server is cleared when the server lists it again or a link to that sequence is made. - An upload of a sequence kept apart from a server sequence goes under a session key of the job, making a new server sequence; a link made over a kept-apart pair moves it to Linked. Refs #73 Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
1 parent
c3273b7da5
commit
123ceba845
13 files changed
+418
-13
No files matched your search
@@ -1008,3 +1008,9 @@ One line per decision: date · decision · alternative · reason.
|
||||
| 2026-11-17 | Hindi: merging two sequences reads मर्ज (*सीक्वेंस मर्ज करें*, *मर्ज जारी*), as project merges already did, instead of मिलाएँ/मिलाना; *मिलान* stays the match term; merging import sessions keeps मिलाएँ (#73) | Keep मिलाएँ for both merges | *मिलाना · 40 %* (merging) and *मिलान · 3* (matches) sat side by side in one State column and read as one word |
|
||||
| 2026-11-17 | Croatian keeps *podudaranje* for a match (the Windows term of Find › Match), but the matching sequence itself is *podudarna sekvenca*: "s njoj podudarnom sekvencom", "odvojeno od podudarne sekvence" (#73) | *podudarnost*; *par* | "Njezino podudaranje" reads as "its matching", an act, where the tooltip means the other sequence |
|
||||
| 2026-11-17 | Finnish keeps *kohteen {0}* for a name in a placeholder (the usual way to avoid inflecting it), but never right after a count: "{0:N0} kuvaa kohteesta {1}" instead of "{0:N0} kohteen {1} kuvaa" (#73) | Inflect the placeholder | After a number *kohteen* reads as "of n items" |
|
||||
| 2026-11-17 | A merge plan hashes, in memory, each unhashed frame of the kept sequence that matches a hashed photo of the other by size and time only: the same content counts as held by the kept one (no last copy); another content is copied in as a second version (*FetchVersion*) whatever the policy, left out of the projects as a Union keep-both is, unless the kept one's tombstones refuse it (#73) | File it at the verify, as for an unhashed photo of the other | The plan listed it as a last copy, so the verify settled it before it could be filed and it went to the trash; the plan now shows the copy it makes |
|
||||
| 2026-11-17 | The merge's Replace stage trashes a losing version of the kept sequence only while it is a last copy the plan listed (`MergeJournal.LastHere`), or another usable frame of the kept one or another sequence still holds it; otherwise the journal goes and the job fails as a stale plan (#73) | Keep the loser and report it | The plan made again lists the new last copy, so the user decides on it; nothing is trashed that was never shown |
|
||||
| 2026-11-17 | A details conflict at the merge's or the Integrate's Details stage (a settings version or a payload that moved since the plan) drops the journal before the job fails: the retry plans again and names what the new plan needs (#73) | Keep the journal for a retry | The change never goes back, so every retry failed the same way until Cancel |
|
||||
| 2026-11-17 | The Integrate's Projects stage counts a project as kept for good only for a refusal a retry would meet again (`TransplantFormatException`, `InvalidDataException`, `ProjectException`, a non-transient server refusal, no project home on either side); any other error (a home out of reach, a network error) fails the job with the journal and the copy's step kept, so a retry finishes that copy (#73) | Count every error as a kept project | One transient error deleted the journal, and the next Integrate copied the half-made copy back as a new project on each side |
|
||||
| 2026-11-17 | A pair's "deleted on server" mark is cleared whenever the server lists that sequence again (whatever the hit count) and whenever a link to that very sequence is made (upload, download, Integrate, Link, auto-link) (#73) | Clear only a single hit | A pair at two hits stayed "deleted on server" for good, even linked again, and its new photos never moved |
|
||||
| 2026-11-17 | An upload without a target of a local sequence kept apart from a sequence of that server goes under a session key of the job (`chronos-sync:<local:N>:<job:N>`, the same on a retry) instead of the sequence's own; a link made over a Kept apart pair moves it to Linked (#73) | Refuse the upload | The server files the sequence's own key into the sequence the user kept separate, and re-linked it without asking; the store and the link disagreed |
|
||||
Reference in new issue
Block a user