Files
Anubis/tools/Anubis.Tasks
Alby96andClaude Opus 5.5 6ea303e1dc
ci / test (postgres) (pull_request) Skipped
ci / image (pull_request) Waiting for needed jobs
ci / test (postgres) (push) Successful in 23m7s
ci / image (push) Skipped
Run the test PostgreSQL behind an init and let pg_isready give up before Docker (refs #98)
The server log of a failing job shows every restart as 'untracked child
process exited with exit code 2'. A health check that outlives its 3-second
timeout leaves pg_isready to PostgreSQL, which is PID 1 in its container;
when pg_isready exits the postmaster takes it for a crashed backend and
restarts every connection. --init reaps such orphans, and pg_isready -t 5
under a 15-second timeout is never cut off. Same change in docker-compose.yml.
ADR 0015.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-15 13:03:44 +01:00
..