Commit Graph
2 Commits
Author SHA1 Message Date
Alby96andClaude Opus 5.5 f278ff4f67 Fix the defects of the Phase 4 review (refs #34 #35 #36)
ci / test (postgres) (push) Successful in 2m41s
ci / test (sqlite) (push) Successful in 1m56s
ci / test (postgres) (pull_request) Successful in 3m45s
ci / test (sqlite) (pull_request) Successful in 2m22s
ci / image (push) Successful in 1m10s
ci / image (pull_request) Successful in 13s
- An error of the database (PostgreSQL restarting) no longer stops the
  laboratory until the next start: the queue logs it, waits 30 seconds
  on the injectable clock and tries the same trial again.
- Buy and hold, the comparison of every report, buys an instrument
  whose history starts later at its first close, with the share kept
  free for it; before, it was never bought and the others took its
  weight. Its version goes to 2.
- The comparison page reads a and b as text: a malformed id shows
  "two finished tests needed" instead of an error page.
- A trial re-checks the hash of its plan before running and refuses a
  plan that no longer matches it.
- Parameters that count days take whole numbers only (10.5 would run
  as 10 and count twice in the DSR); the capital starts from 1, as the
  message says.

ADR 0010 says so, and corrects the estimated minimum of the research
history: 5 does refuse smaller orders, like the exchanges' minimums.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-11 10:17:18 +01:00
Alby96andClaude Opus 5.5 d97304d7b9 Add the event-driven backtest engine and the strategy interface (refs #34)
The strategy contract of SPEC 5.3 (IStrategy, StrategyContext, Intent) is
shared by backtest and live: the context exposes bars only up to the
decision, adjusted and anchored to that day, and reading past it throws.
The engine runs each session as ordered events (corporate actions, open,
session, close), decides on the close and executes at the next open with
the simulator's price lists, slippage tiers, tick and lot rounding,
minimums and no leverage. Corrective and risk hooks are wired in and pass
everything through until Phase 5. One decision cycle can restart from a
recorded book (SPEC 12.3).

A scripted toy strategy reproduces a result computed by hand to the cent
on OKX and Alpaca costs. The Phase 3 class Trading.Strategies becomes
StrategyNames so the Anubis.Strategies namespace can exist.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-11 09:29:01 +01:00